Processing Timelines

Timelines depend on scope, completeness, and the number of clarification cycles. This page provides a stage-gate view so applicants can plan drafting, evidence packaging and launch milestones.

Completeness checks Clarification cycles Decision-to-publication

Main driver of speed

Evidence pack quality. One clean pack beats “fast drafting” every time.

Clarification cycles

Each cycle adds time. Plan for rapid responses and version-controlled resubmissions.

Operator vs Supplier

Supplier validations often focus on security, logs and testing evidence; operators on AML/RG and funds flow.

Stage-gate flow

High-level view of what happens, in order.

1

Pre-submission alignment

Scope selection, evidence inventory, and pack structure setup (ideally with a Registered Agent).

Applicant + AgentEvidence indexRole mapping
2

Submission + fee confirmation

Submission pack is lodged, fee references verified, file created, and initial acknowledgement issued.

Invoice referencesPack versioningReceipt
3

Completeness checks

Mandatory artefacts and identity/corporate basics are checked. Missing items trigger quick clarification.

Intake gateDocument gapsFast loop
4

Substantive review

Controls assessed by domain (AML/CFT, RG, security, integrity, outsourcing, disclosures).

Domain reviewControl mappingArtefact checks
5

Clarification cycles (if needed)

Questions are issued; applicants respond with updated artefacts. Each cycle should be versioned and indexed.

Q&A roundsResubmissionChange log
6

Decision + publication

Decision issued. Where applicable: issuance fee confirmation and public register publication step.

Decision noticeIssuance feeRegister
Applicant / Agent Process stages Align Submit Complete Review Clarify Decide

Indicative ranges (framework)

Use these as planning bands. Publish official numbers separately if needed.

Stage Typical band What changes it
Pre-submission alignment 1–4 weeks Evidence inventory maturity, drafting capacity, agent availability.
Completeness checks 1–2 weeks Missing corporate docs, unclear scope, incorrect pack structure.
Substantive review 4–10 weeks Complexity, number of domains, technical validation depth.
Clarification cycles +1–4 weeks each Response speed, version discipline, evidence quality.
Decision → publication 1–3 weeks Issuance fee confirmation, final checks, register publication queue.

Fastest way to cut time

Keep artefacts versioned, indexed, and mapped to requirements. Unstructured PDFs are timeline killers.

Planning ranges are illustrative and should not be treated as a guarantee. Complexity and clarification cycles vary by file.

What causes delays (top 6)

Common issues seen in intake and review phases.

Wrong scope selection

Operator vs supplier obligations mixed.

No artefact index

Reviewers can’t find evidence quickly.

Weak logs

Security / monitoring evidence missing.

AML gaps

KYC/monitoring not operationalised.

RG not measurable

No thresholds, triggers or interventions.

Slow clarifications

Untracked changes and late replies.

If you want a “minimum viable pack” approach, start with the Requirements Hub and build the evidence index first.